Showing posts with label Advantages and Disadvantages of Iterative Waterfall model. Show all posts
Showing posts with label Advantages and Disadvantages of Iterative Waterfall model. Show all posts

Wednesday, December 12, 2012

Iterative Waterfall Model

  • Water Fall model has been revised later to be Iterative.
  • Everything remains the same as Waterfall Model.
  • It is easy to use.

Iterative Waterfall Model.
Iterative Waterfall Model



SDLC,iterative waterfall model,picture,image
Iterative Waterfall Model.
  • Each iteration involves Design Analysis and Implementation as well as verification of the current build/version of the system.
  • If the application lacks any requirements or has any problems then the phase will be looped back to previous iteration.
  • It supports redesign, acceptance and review of any new requirement.
  • It involves analysis of usability, achievement of goals, reliability, efficiency, and structure. 


iterative waterfall model,SDLC
Waterfall Model Iteration.


  • It has many draw backs - each process is iterative and has many problems to meet the project deadlines.


Important Links:




Google Search